Piper Alpha was an oil platform located in the North Sea approximately 120 miles (190 km) north-east of Aberdeen, Scotland. It was operated by Occidental Petroleum (Caledonia) Limited and began production in 1976, initially as an oil-only platform but later converted to add gas production.

Piper Alpha Disaster
An explosion and resulting oil and gas fires destroyed Piper Alpha on 6 July 1988, killing 167 men, including two crewmen of a rescue vessel; 61 workers escaped and survived. Thirty bodies were never recovered. The total insured loss was about £1.7 billion, making it one of the costliest man-made catastrophes ever. At the time of the disaster, the platform accounted for approximately ten percent of North Sea oil and gas production. The accident is the worst offshore oil disaster in terms of lives lost and industry impact.

In Aberdeen, the Kirk of St Nicholas on Union Street has dedicated a chapel in memory of those who died, containing a Book of Remembrance listing them. There is a memorial sculpture in the Rose Garden of Hazlehead Park.

Four companies that later became the OPCAL joint venture obtained an oil exploration licence in 1972. They discovered the Piper oilfield located at 58°28′N 0°15′E in early 1973 and began fabrication of the platform, pipelines and onshore support structures. Oil production started in 1976 with about 250,000 barrels (40,000 m3) of oil per day, increasing to 300,000 barrels (48,000 m3). A gas recovery module was installed by 1980. Production declined to 125,000 barrels (19,900 m3) by 1988.


OPCAL built the Flotta oil terminal in the Orkney Islands to receive and process oil from the Piper, Claymore, and Tartan oilfields, each with its own platform. One 30-inch (76 cm) diameter main oil pipeline ran 128 miles (206 km) from Piper Alpha to Flotta, with a short oil pipeline from the Claymore platform joining it some 20 miles (32 km) to the west. The Tartan field also fed oil to Claymore field and then onto the main line to Flotta. Separate 18-inch (46 cm) diameter gas pipelines were run from Tartan platform to the Piper, and from Piper to the gas compressing platform MCP-01 some 30 miles (48 km) to the northwest. More details